 Country  Italy
 Customer  FS S.p.A,/TAV S.p.A
 Value  167 million Euro
 Order Date  9/2000
 Completion Date  9/2008
Italy High Speed Project, Milan~Bologna section
The scope of work includes engineering, procurement, installation, test and commissioning for:

  • 115 km overhead transmission line 132 kV
  • 105 km double track 2x25 kV AC overhead contact line
  • 2 substations 132 / 25 kV AC/AC
  • 4 sub-stations 132 / 3 kV AC/DC
  • 6 autotransformer stations 2x25 kV AC
  • 11 technological buildings fro lighting and distribution
  • 70 km Low Voltage Power Supply
  • Remote Control System for power supply to the whole section