The scope of work includes engineering, procurement and commissioning for:
- 31 km Overhead Transmission Line 132 kV
- 4 km 132 kV underground cable
- 50 km double track, 2x25 kV AC overhead contact line
- 1 substation 132 / 25 kV AC/AC
- 1 substation 132 / 3 kV AC/DC
- 1 autotransformer station 2x25 kV AC
- 50 km Low Voltage Power Supply
- Remote Control System for Power Supply for whole section
First section of the Turin - Milan high speed line started commercial operations on 6 February 2006.
|