The scope of work includes engineering, procurement and commissioning for:
- 10 km 132 kV underground cable
- 41,5 km double track 2x25 kV AC tunnel overhead contact line
- 2 substations 132 / 25 kV AC/AC
- 2 TE 3kV cabins
- 2x20 low voltage power supply for tunnel safety systems
- 2x20 km mediaum voltage power supply
- MV/LV automation and rest system of the power supply, SCADA
- Remote Control System for power supply system for the whole section
|