The North-South-Connection Berlin belongs to the inter-city-connection from Nordring over Berlin main-station to Suedring.
Balfour Beatty Rail is general contractor for the railway technology inter alia the power supply 50 Hz in lot 2. The scope comprises the medium-voltage power grid with 17 substations, tunnel safety lighting, tunnel-power supply and point heating. |